1 Annual Maintenance contract for Electrical and C&I Equipment of 2x700 MW Nabha Power Limited, Rajpura NPL, L&T Running
2 Breakdown, Periodic and Shutdown maintenance of static and digital AVR, 220KV, 66 KV C&R Panels, DRs, GRP, GCDP,RTCC Panels, Protection system installed on 6.6KV & 415V switchgear and other misc. panels including meters, Fire detection and alarm system, Telephone exchange and PA system in Plant and Power Colony for Stage-I (2x210MW) & Stage-II (2x250MW) GHTP, PSPCL Running
3 Preventive, Routine, Breakdown and Shutdown maintenance of 220/132 KV Switchyard & Associated equipments of Stage-I & II at GNDTP. GNDTP, PSPCL Running
4 Preventive, Routine, Breakdown and Shutdown maintenance of 415V LT Switchgear & associated equipments of Stage-I & II at GNDTP. GNDTP, PSPCL Running
5 Routine, Breakdown, Preventive Maintenance and Overhauling of Electircal and Pneumatic Valves & Actuators and Instrument manual root valves in TG areas, Boiler areas, LD HFO & CW Pump DM plant, Ash Water Recovery System of 2x210MW and 2x250MW Units. GHTP, PSPCL Running
6 Annual Maintenance of C&I system of 2x600 MW Unit 1&2. RGTPP,HPGCL Running
7 Routine, Breakdown, Periodical / Annual maintenance / Overhauling of C&I equipments in FSSS, ASLD , Local PLC system, local gauges, H2 plant , Ash water Recovery system etc. installed at Stage-I & II GHTP, PSPCL Running
8 Annual Opeartion & Maintenance of Air Conditioning & Air Ventilation System at IGSTPP for 3x500MW Units APCPL, NTPC Running
9 Annual Running Contract for Operation and Maintenance of AC system,Water cooler and Ventillation System of 2x600 MW, RGTPP. RGTPP, HPGCL Running
10 Contract for Maintenanace of Actuators of 3x500 MW Units at IGSTPP. UPL, NTPC Running
11 Routine, Preventive & Breakdown Maintenanace and Annual Overhauling of 2x210 & 2x250 MW Turbo generators (electrical works), HT & LT Motors in main Plant area, 16.50KV, 15.75KV, 6.6 KV & 415 V Bus ducts, Lifts/Elevators, EOT Cranes/Hoists etc. GHTP, PSPCL Completed
12 Overhead & Electrical Maintenance works on Bus bars, Isolators, Breakers their MKs, CTs, PTs, Power Transformers & their cooling system etc. in 220 KV Switchyard unit 5&6 and Switchyard unit 7&8. PTPS, HPGCL Completed
13 Maintenance of 220KV switchyard, 66KV switchyard & 66KV sub-station, equipments including super structures, all Transformers, Transformer oil filteration sets of stage 1 & 2 under sub-station Mtc. Cell for Stage-I &II at GHTP GHTP, PSPCL Completed
14 Breakdown, Shutdown, Preventive and routine maintenance of Electrical control system, PLC system, Switchgear, Instrumentation system, Lighting system, HT/LT Motors, Cables, Dust Suppression and ventilation system etc. in CHP at GHTP, Lehra Mohabbat GHTP, PSPCL Completed
15 Preventive, Breakdown & Shutdown Maintenance of 6.6 KV & 415V AC ,220V & 24V DC Switchgears, ESP Control Panels and other local control panels and associated equipments, Battery Banks, Battery chargers, HT & LT Power and control cables installed at various locations under Switchgear Mtc. Cell in 2x210MW units of stage-I and 2x250MW units of stage-II GHTP, PSPCL Completed
16 Breakdown, Periodic and Shutdown maintenance of static and digital AVR, 220KV, 66 KV C&R Panels, DRs, GRP, GCDP,RTCC Panels, Protection system installed on 6.6KV & 415V switchgear and other misc. panels including meters, Fire detection and alarm system, Telephone exchange and PA system in plant and power colony for stage I & II GHTP, PSPCL Completed
17 Preventive, Routine, Breakdown and Shutdown maintenanace of 415V LT Switchgear & associated equipments of Stage-I & II at GNDTP. GNDTP, PSPCL Completed
18 Annual Maintenance of C&I system of 2x600 MW Unit 1&2. RGTPP,HPGCL Completed
19 Annual Maintenance contract of C&I jobs of 3x500MW Units. APCPL, NTPC Completed
20 Routine, Breakdown, Preventive Mainteance and Over hauling of Electircal and Pneumatic Valves & Actuators and Instrument manual root valves in TG areas,Boiler areas,LD HFO & CW Pump DM plant, Ash Water Recovery System of 2x210MW and 2x250 MW Units. GHTP, PSPCL Completed
21 Routine, Breakdown, Periodical / Annual maintenance / Overhauling of C&I equipments in FSSS, ASLD , Local PLC system, local gauges, H2 plant , Ash water Recovery system etc. installed at Stage-I & II GHTP, PSPCL Completed
22 Routine, Breakdown & Periodical/ Annual maintenance of C&I equipments installed in interlocks and Measurement system, Annunciation system, Flue gas Analyzers, steam & water analysis system under Sr. Xen./M&I cell of Stage-I & II GHTP, PSPCL Completed
23 Repair/breakdown and Preventive mtc./Overhauling of Motorized,Pneumatic Operated Valves and Gear Boxes alongwith Assoicated Electrical/Pneumatic Actuators of 6 X 210MW. GGSSTP, PSPCL Completed
24 Assistance in Breakdown/Preventive Maintenance and Annual Overhauling of Interlock and Measuremnt system of stage-1 2,and 3 and local gauges. GGSSTP, PSPCL Completed
25 Running/ Periodidic Maintenance of Central Air Conditioning Units and Portable Air Conditioners, Water Coolers, Refrigerators, Bottle Coolers & Desert Coolers etc. NFL, Bathinda Completed
26 Operation & Maintenance of 2x500 KVA DG sets at Township. HPCL- Mittal Energy Ltd. Completed
27 Annual Running Contract for Operation and Maintenance of Air Conditioing System, Water Cooler and Ventillation System of 2x600 MW,RGTPP Units. RGTPP, HPGCL Completed
28 Annual Maintenance Contrcat for round the clock Opeartion, Routine & Breakdwon Maintenanace of Air Conditioing and ventilation System, Package AC Units, Window & Split AC, Water Coolers in Plant for 6x250MW Units SSTPS, RVUNL Completed
29 Erection of 11 KV Lines, Pole mounted sub stations, LT Lineas for Providing Tubewell connections under DS division, Bathinda. PSPCL Completed
30 Laying, Termination , Testing & Commissioning of 220KV Switchyard Cables at 2x210MW, GHTP GHTP, PSPCL Completed


About Us

We at GILL ENGINEERING PVT.LTD are fully geared up to provide expertise engineering services to our esteemed clients across a wide array of domains. Our spectrum of business activities covers the following: Boiler & its AuxiliariesTurbine & its AuxiliariesCoal Mills & FansCompressors & PumpsCrushers, Rotary Breakers & Conveyor  System Wagon Tipplers and Stacker & ReclaimersFabrication & Erection of Piping & StructureConveyor Belt JointingCeramic & Rubber Lagging of Pulleys O&M of Ash Handling PlantO&M of Hydrogen Plants

Find us at

REGD. OFFICE:
#1, Vishvas Nagar, Goniana Road, P.O. NFL, Bathinda-151003

0164-2270895, 3297051
gill.engineering@yahoo.in

Send us a message

X